7075 Harden Aluminum Anodized CNC Milling

Jun 09, 2014

ترك رسالة

1. Before starting the furnace, check the equipment according to the pit carburizing furnace operating regulations.

2. Carburize the furnace tank and hanger in advance according to the shutdown time and the situation of the furnace tank. The general pre-carburizing time is: 812h for the new furnace, 4h for the old furnace, and 4h for the hanger.

Please contact us at zhang@pride-cnc.com7075-harden-aluminum-anodized-cnc-milling43148235156

إرسال التحقيق